How long will it take for 5 men to complete the same job that 10 men can do in 6 hours?

Prepare for the USTET Mental Ability Test with our quiz. Study with varied questions, detailed explanations, and insightful hints. Enhance your mental ability and get ready for the exam!

Multiple Choice

How long will it take for 5 men to complete the same job that 10 men can do in 6 hours?

Explanation:
To find the time it will take for 5 men to complete the same job that 10 men can do in 6 hours, we first need to determine the total amount of work required, which can be defined in terms of "man-hours." If 10 men can complete the job in 6 hours, the total work can be calculated as follows: Total work = Number of men × Time taken = 10 men × 6 hours = 60 man-hours. Now, if 5 men are tasked with completing the same job, we need to find out how long it will take them to achieve the same 60 man-hours of work. Let’s denote the time taken by 5 men as "T" hours. The work done by 5 men in T hours can also be expressed in man-hours: Work done = Number of men × Time taken = 5 men × T hours = 5T man-hours. Since the amount of work needed to complete the job remains constant at 60 man-hours, we can set up the equation: 5T = 60. To find T, divide both sides by 5: T = 60 / 5, T = 12 hours. This shows that it will take

To find the time it will take for 5 men to complete the same job that 10 men can do in 6 hours, we first need to determine the total amount of work required, which can be defined in terms of "man-hours."

If 10 men can complete the job in 6 hours, the total work can be calculated as follows:

Total work = Number of men × Time taken = 10 men × 6 hours = 60 man-hours.

Now, if 5 men are tasked with completing the same job, we need to find out how long it will take them to achieve the same 60 man-hours of work. Let’s denote the time taken by 5 men as "T" hours.

The work done by 5 men in T hours can also be expressed in man-hours:

Work done = Number of men × Time taken = 5 men × T hours = 5T man-hours.

Since the amount of work needed to complete the job remains constant at 60 man-hours, we can set up the equation:

5T = 60.

To find T, divide both sides by 5:

T = 60 / 5,

T = 12 hours.

This shows that it will take